03 Oct
2014
TOP – Truccazano Optimization Project

TOP – Truccazano Optimization Project

Within seven weeks, the total impact of the above measures led to an average reduction in setup times to 13 minutes (11 minutes, in the best case), which greatly improved the overall flexibility of the production system. It is obvious…

Continue Reading
  • 1
  • 2